358
absorbed in preparing the sites which school, for him a house. may be built is sleep as a house roof. a 024 the plot of ground. shown hinted green in Drawing h: 1. This ground, which is steep hill slope is the property of the Government.
12. The estimated cost of the new school building is $100,000 That of a stand master's re- Head sidence consisting of four rooms and suitable out-offices, the ordinary type of European time. ment in Hong Kong will Comb to an additional $11,000. Of this figure # 2,000. will be absorbed
13. In conclusion I must not fail to point out, with reference to the arrangement proposed for the new School building and ground, Goulding and that although it would have been decidedly preferable for the sake of better ventilation and drainage to have built the school on slope instead of putting it under the lee of A 14 excavation and pelaming wall, this hav not bun possible in this instance for the reason that the ground was
358
-sorbed in preparing the sites which
school, for him
a
house.
may
be built
is
sleep
as
a
house roof.
a
024
the plot of ground.
shown hinted green in Drawing
h: 1. This ground, which is
steep hill slope is the property of the Government.
12.
The estimated cost of the new
school building is $100,000
That of
a
stand master's re- Head
sidence consisting of four pooms
and suitable
out_offices, the
ordinary type of European time.
ment in Hong Kong will
Comb
to an additional $11,000. Of this figure # 2.000. will be ab-
sorbed
13.
In conclusion I must not
fail to point out, with reference to the arrangement proposed for
the new School building
and ground,
Goulding and
that although it would have been
decidedly preferable for the sake of beller.
ventilation and drainage
to have built the school on
slope instead of putting it
-der the lee of
A 14
excavation
and pelaming wall, this hav
not bun possible in this instance for the reason that the ground
was
No comments yet.
Private notes are available after approval.